Wednesday 2 November 2011

Design schematics - Round 2

On Tuesday, Kris and I met once again with Bruce and Ian over at the new digs. In our stinky, dark, and dilapidated living room, we went over the new round of designs which had been developed off of the feedback from round one. Here are the new versions - let us know what you think of them....


Our general preference was 4.3, though we still had a bunch of points of feedback....


So - on Friday we're slated to have another round of things with an additional version that has a galley like kitchen (like Option 1 above) combined with most of the feel of 4.3. We'll see how that goes and take it from there. In the meantime, I'm trying to nail down some numbers on the Hazmat info, which I'll post this weekend.

1 comment:

  1. Make sure you do a traffic path study to any finalists. Draw in doors of appliances and closets in an open position and draw lines showing where the people will walk to get from room to room and from entrances into the house. This will quickly identify where you have bottlenecks. There is nothing like the inability to get from an entrance to the rest of the house, when someone is in the kitchen and has the fridge door open, to irk you for the rest of time.

    ReplyDelete